Search Results
243 results found with an empty search
- Annual Natural Gas Pipeline Inspection for a Petrochemical Plant in Jurong Island, Singapore
Home / Projects Projects Annual Natural Gas Pipeline Inspection for a Petrochemical Plant in Jurong Island, Singapore April 13, 2023 All Projects, Urban Resilience TEMBUSU Asia Consulting was engaged to carry out annual natural gas pipeline inspection for a petrochemical plant in Jurong Island. As part of regulatory compliance, an inspection of the natural gas pipe is required to ensure its soundness and thus enhance the sustainability of production safety. Inspection of the gas pipeline will be carried out to check the condition of the gas pipe installation (e.g. for any signs of corrosion and leakages) and to observe any significant pressure drops to ensure the safety of the plant. Previous Back Next
- Site Assessment and Environmental Impact Study in Singapore
Home / Projects Projects Site Assessment and Environmental Impact Study in Singapore March 4, 2020 All Projects, Environmental & Ecology TEMBUSU Asia Consulting together with our partner is awarded a consultancy service work comprising of three sites in the north-eastern part of Singapore where transportation facilities are planned. The scope covers the Site Assessment and Environmental Impact Study (EIS) works. The development of Site 1 includes the construction of a multi-storey development with underground transport operational facilities. The scope includes site investigation & assessment of the environmental impacts due to the proposed works within the former landfill site and design of the associated environmental control infrastructure. The development at Site 2 and Site 3 includes road works, a viaduct, and other ancillary works within an Identified Biodiversity Site (IBS). EIS is to be carried out to study impacts on the IBS due to the proposed road projects. The works include the collection of baseline survey data covering biodiversity, water quality, and noise quality. The data would then be analyzed to assess the environmental impacts associated with the construction and operational phases of the site based on the proposed development plan. This assessment would be the basis to recommend mitigation measures appropriate to the impacts assessed. An environmental management and monitoring plan would then be prepared to mitigate the adverse impacts during the construction stage. Previous Back Next
- Covid-19 Open Rest Shelter for Construction of Chemical Plant in Jurong Island
Home / Projects Projects Covid-19 Open Rest Shelter for Construction of Chemical Plant in Jurong Island September 9, 2020 All Projects, Urban Resilience TEMBUSU Asia was awarded the consultancy service for an open rest shelter during the construction of a chemical plant in Jurong Island, Singapore. This shelter was constructed to manage safety measurements due to COVID-19 for the construction workers on the project site. The scope includes design review and endorsement of the steel structure and foundation design, including toilet, sanitary, and equipment shelter. We also provide statutory site supervision during the construction and obtaining clearance from relevant authorities. Previous Back Next
- Feasibility Studies at Mandai Mangroves and Mudflat
Home / Projects Projects Feasibility Studies at Mandai Mangroves and Mudflat May 23, 2019 All Projects, Environmental & Ecology TEMBUSU Asia Consulting together with our partners were awarded the consultancy services for feasibility studies at Mandai mangrove and mudflat by the National Parks Board. Being one of the last few remaining mangroves and natural shoreline of Singapore, the future 72.8 ha park shall seek to preserve its ecological condition with minimal disturbance to the site’s ecosystem and biodiversity. Mandai mudflat is an important place for the birds with its rich grounds of molluscs, crustaceans, and worms during the low tide while the birds roost at the adjacent Sungei Buloh Wetland Reserve. The consultancy services comprise of the ecological study and survey of the existing site, hydrodynamic and ecological modelling, to the planning and design of the 72.8 ha park. An Environmental Impact Assessment will also be carried out to mitigate any possible impacts for the park development. This park will also serve as an important green node at the northern part of the Railway Corridor as well as part of the eco-discovery corridor in the Park Connector Network’s Round Island Route. Previous Back Next
- Annual Gas Pipe Inspection at Jurong Island
Home / Projects Projects Annual Gas Pipe Inspection at Jurong Island June 15, 2021 All Projects, Urban Resilience TEMBUSU Asia Consulting (TAC) was appointed to carry out the annual inspection of gas pipe installation in Jurong Island. This annual inspection is a requirement of the Gas (Supply) Regulations to ensure no leakage or corrosion to the gas installation and that gas supply remains safe. Upon completion of the annual inspection, a Certificate of Fitness will be issued if the gas installation is found to be in good operating condition. This is the third consecutive year that our Client engages us in this service, and we are pleased to be able to deliver satisfactory and quality services that remain consistent through the years. As part of our efforts to fulfil SDG #9: Industry, Innovation and Infrastructure and SDG #11: Sustainable Cities and Communities, we are excited to contribute to building a sustainable and innovative city for all to live in.SDG9I Previous Back Next
- Greenhouse Gas Emission Verification for Textile Manufacturer
Home / Projects Projects Greenhouse Gas Emission Verification for Textile Manufacturer September 15, 2022 All Projects, Climate Change Adaptation & Mitigation TEMBUSU Asia Consulting (TAC) was appointed to provide Greenhouse Gas (GHG) emission verification for a vertically integrated textiles and apparel manufacturer who has operations in Malaysia, Cambodia, China, Vietnam, and Jordan. Our GHG verification will support our client’s sustainability strategy and their upcoming application for a Sustainability-linked loan (SLL). GHG emissions reduction was identified as the Sustainability Performance Target (SPT) for the SLL and it is a requirement for the GHG emissions baseline to be verified by an independent third party. The scope of work involves reviewing and verifying the client’s Scope 1 and 2 GHG emissions for 2019 and 2020 in accordance with ISO 14064-3:2019. A verification report with verification statement endorsed by TAC will be submitted to our client. Through this service, TAC supports our clients in transitioning to low carbon economy and strengthen their resilience in meeting SDG#13: Climate Action. For more information on our GHG Verification services, click here . Previous Back Next
- Stack Extension for a Chemical Plant, Singapore
Home / Projects Projects Stack Extension for a Chemical Plant, Singapore April 20, 2020 All Projects, Urban Resilience TEMBUSU Asia was awarded consultancy services on stack extension for a chemical plant in Singapore. The scope includes design review and endorsement of the steel frame that supports the 45 m long stack and its foundation design. We also provide statutory site supervision during construction and obtaining clearance from relevant authorities. Previous Back Next
- EMMP Services for Proposed Industrial Development at Kranji, Singapore
Home / Projects Projects EMMP Services for Proposed Industrial Development at Kranji, Singapore March 4, 2022 All Projects, Environmental & Ecology TEMBUSU Asia Consulting (TAC) was engaged to provide environmental consulting services for an industrial project in Kranji. Given the rich biodiversity inhabiting the mangroves and mudflats along the coast, TAC would recommend measures to ensure that the works do not adversely affect sensitive fauna, particularly due to the generation of noise from industrial activities. Our services enabled our client to conduct their project in an environmentally sensitive manner, thus moving towards fulfilling UN SDG 11: Sustainable Cities and Communities and SDG 15: Life on Land. Previous Back Next
- Environmental Impact Study (EIS) for an industrial development in north-western Singapore
Home / Projects Projects Environmental Impact Study (EIS) for an industrial development in north-western Singapore May 6, 2021 All Projects, Environmental & Ecology TEMBUSU Asia Consulting was commissioned to conduct an Environmental Impact Study (EIS) for the land clearance of an industrial development in north-western Singapore. The scope of this EIS includes a biodiversity study to establish the ecological baseline of the project site, an assessment of the impacts of land clearance on the environment, and the recommendation of appropriate measures to mitigate these impacts. TEMBUSU Asia will also conduct biodiversity awareness training to brief key personnel on biodiversity issues pertaining to the project, including species found at the project site, the importance of biodiversity conservation, and ways to avoid human-wildlife conflict. We believe that by working with and providing sound recommendations to the Client, we will be able to help minimise adverse impacts on the surrounding natural environment for the duration of this project. Previous Back Next
- Multi-disciplinary Consultancy Services for Enhancement of Mandai Mangrove and Mudflat
Home / Projects Projects Multi-disciplinary Consultancy Services for Enhancement of Mandai Mangrove and Mudflat May 5, 2022 All Projects, Environmental & Ecology TEMBUSU Asia Consulting (TAC) was awarded the environmental consultancy works for the enhancement of Mandai Mangrove and Mudflat. Following the completion of feasibility studies in 2020, TAC is glad to continue the work for the detailed design and construction of the proposed nature park as part of a multi-disciplinary team. Baseline data collected from various environmental surveys we conducted would aid in understanding potential impacts of the development on the biodiversity and ecology, hydrodynamic condition, and other relevant environmental aspects. TAC would advise the multi-disciplinary team on mitigation measures to minimize impacts from the development. Stakeholder consultations would be carried out during the EIA process to incorporate feedback from relevant stakeholders. TAC will also supervise the EMMP implementation for both construction and post-construction stages. For this project, TAC combined its multi-disciplinary strength and capabilities in environmental and ecological assessment, habitat enhancement, and wildlife management to protect and conserve one of the last remaining mangrove forests and the most extensive mudflat site in mainland Singapore. #MandaiMangroveMudflat #NatureBasedSolution #EIA #Multidisciplinary #Biodiversity #Ecology #Hydrodynamic #Sediment #Modelling #EMMP #StakeholderEngagement #HabitatEnhancement #WildlifeManagement #Mangrove #Mudflat #Singapore #SDG11 #SustainableCitiesCommunities #SDG14 #LifeBelowWater #SDG15 #LifeAboveLand Previous Back Next
- Sustainability Awareness Training for the Shipping Industry
Home / Projects Projects Sustainability Awareness Training for the Shipping Industry September 15, 2022 All Projects, Capacity Building TEMBUSU Asia Consulting (TAC) was invited to conduct a sustainability awareness training for a shipping company that provides classification and technical advisory services to the marine and offshore industries. The participants consisted of the global management team from Asia (i.e. Korea, Japan, Hong Kong, China, Indonesia, Malaysia, Singapore, India) and Middle East countries. With about 90% of world trade transported by sea and global shipping accounting for nearly 3% of the world’s CO2 emissions, the shipping industry plays an important role in tackling climate change. International Maritime Organization (IMO) has set a target to reduce the carbon intensity of international shipping by at least 40% by 2030 and reduce the total annual greenhouse gas emissions from international shipping by at least 50% by 2050 based on 2008 figures. In Singapore, the Maritime and Port Authority (MPA) launched the Maritime Singapore Decarbonisation Blueprint 2050 in March 2022 contributing to Singapore’s commitments under the UN’s 2030 Sustainable Development Agenda. Our training aims to equip participants with the skills to anticipate future trends, risks, and opportunities and sort the broad array of options for action to identify efforts that will provide the greatest business value, hence fulfilling SDG 4: Quality Education and SDG 17: Partnerships for the Goals. Previous Back Next
- EMMP project for the construction of housing development in Pasir Ris
Home / Projects Projects EMMP project for the construction of housing development in Pasir Ris July 29, 2021 All Projects, Environmental & Ecology TEMBUSU Asia Consulting (TAC) was awarded an Environmental Management and Monitoring Plan (EMMP) project for the construction of housing development in Pasir Ris. The work mainly covers the development of a detailed construction EMMP framework during the pre-construction stage, outlining the mitigation and management measures to ensure that the proposed works do not adversely affect the environment around the project site. Additionally, TAC developed a Wildlife Management Plan to advise the Client on wildlife protection and encounter. Given that the project is located adjacent to an existing forested area, TAC will provide support for biodiversity monitoring throughout the construction period to ensure that the mitigation measures implemented are effective for the protection of biodiversity. Previous Back Next












